Concrete Anchor Spacing ChartMinimum Spacing and Edge Distance

A technical reference for contractors, engineers, installers and inspectors: minimum versus critical spacing, edge distance, embedment, anchor groups and a verified manufacturer example from Hilti KWIK BOLT TZ2 data.

Manufacturer-identified chartEdge distance and thickness3hef breakout geometryWorked formulasLast updated: October 2026
Jump to the Chart

Key Facts

  • No universal minimum spacing exists. It depends on the anchor system, embedment, edge distance, concrete thickness and installation conditions.
  • Minimum installation spacing, critical breakout spacing (3hef) and maximum layout spacing are three different concepts.
  • Example: Hilti KB-TZ2 3/8 in., 2 in. embedment, needs 2-1/2 in. edge distance with 6 in. spacing (Case A) or 2-1/4 in. spacing with a 3-1/2 in. edge distance (Case B).

Concrete Anchor Spacing Chart: Quick Reference

Minimum spacing and edge distance for a manufacturer-identified expansion anchor, with the three spacing concepts explained.

There is no universal minimum spacing for concrete anchors. Permitted spacing depends on the anchor system, embedment, edge distance, concrete thickness and installation conditions, so this chart gives one manufacturer-identified example instead of a generic rule. For sill-plate bolts in residential foundations, see the separate Anchor Bolt Spacing Chart; this page covers engineered concrete anchor groups.

How to Read This Chart

Pick the row for your anchor diameter and effective embedment. Then choose Case A or Case B and meet both numbers in the same case. Case A allows a smaller edge distance if spacing is large. Case B allows a smaller spacing if the edge distance is large. A chart value is valid only for its stated product, embedment, concrete thickness and installation conditions.

Hilti KB-TZ2 carbon-steel torque-controlled expansion anchor in cracked and uncracked concrete. Case A and Case B are two separate permitted combinations.
Anchor diameterEffective embedment hefMinimum concrete thickness hCase A: min. edge distance cCase A: spacing s at leastCase B: min. spacing sCase B: edge distance c at least
1/4 in.1-1/2 in.3-1/4 in.1-1/2 in.1-1/2 in.1-1/2 in.1-1/2 in.
3/8 in.2 in.4 in.2-1/2 in.6 in.2-1/4 in.3-1/2 in.
1/2 in.2 in.4 in.2-3/4 in.5-1/2 in.3-1/2 in.10 in.
  • Values apply only to the stated Hilti KB-TZ2 carbon-steel configurations. Do not apply them to wedge anchors from other manufacturers, concrete screws, adhesive anchors or cast-in-place bolts.
  • Effective embedment hef is not the same as nominal embedment hnom or the drilled hole depth.
  • Meeting the minimum geometry does not establish tension or shear capacity. Cracked-concrete, seismic and group requirements are checked separately.
  • Interpolation between the two cases is permitted for this product; see the Hilti example below. Check the current product data and evaluation report before use.

Source: Hilti KWIK BOLT TZ2 (KB-TZ2) carbon steel. Data edition: ICC-ES ESR-4266 (reissued December 2023, revised October 2024), Table 3, and Hilti North American Product Technical Guide, Volume 2, Edition 22, Table 5. Units are inches. The 1/2 in. row uses hef = 2 in.; the 1/2 in. anchor has other embedments listed in the diameter section.

Concrete anchor spacing and edge distance measurementsPlan view of a rectangular concrete member with four mechanical anchors under a dashed base plate. Center-to-center spacing sx and sy is measured between anchor centerlines, edge distances c1 and c2 are measured from anchor centerlines to the nearest concrete edges, and clear spacing is measured between anchor shafts.c1sx (center to center)c2syclear spacing = sx – dadaConcrete perimeter (free edge)Base plate edge(not the concrete edge)Anchor centerlinec1 and c2 are concrete edge distances measured to the nearest relevant free concrete edge. All symbols, no dimensions implied.Schematic plan view, not to scale. Check every free edge, including corners.
Concrete anchor spacing is measured center to center, while edge distance is measured from the anchor centerline to the nearest relevant concrete edge.
Steel column base plate secured to a concrete pedestal with four anchor rods, hex nuts and washers, showing center-to-center anchor spacing with a measuring tape.
Mechanical anchors arranged around a steel base plate, with center-to-center spacing measured between adjacent anchor shafts.
CONTRACTOR ESTIMATING PACK

Planning your next concrete project?

Plan concrete materials and project costs with our downloadable Excel estimator pack. For estimating only; follow applicable technical standards for design and installation.

One-time purchase · Digital download
XPROJECT ESTIMATE
ITEMQTYAMOUNT
Concrete12 yd³$—
Rebar—$—
Labor—$—
ESTIMATEYOUR PROJECT
Illustrative spreadsheet preview

What Is Concrete Anchor Spacing?

Anchor spacing is the distance between adjacent anchors, always measured from one anchor centerline to the next. It controls how much concrete each anchor shares, whether the concrete can split during setting, and how anchors behave as a group.

Center-to-Center Spacing

If two anchor centerlines sit at positions x1 and x2 along the same line, the spacing is s = |x2 – x1|. This is a measurement, not a design approval.

Clear Spacing

Clear spacing is the free distance between anchor bodies: s_clear = s – da. It is a nominal shaft calculation and does not account for oversized holes, expansion components, washers or base-plate holes.

Why Spacing Matters

Close anchors can overlap their concrete breakout regions, concentrate expansion forces and share load unevenly. Maximum layout spacing, such as a sill-plate bolt limit, is a different idea from minimum structural spacing.

Other ACI notation is needed for shear edge distance and group breakout calculations.
SymbolMeaningMeasurement
daNominal anchor diameterDiameter
sActual anchor spacingCenter to center
s_minMinimum permitted spacingProduct and design specific
scr,NCharacteristic tension breakout spacing3hef in the simplified ACI model
cActual edge distanceAnchor center to concrete edge
c_minMinimum permitted edge distanceProduct and design specific
hefEffective embedment depthAs defined for the anchor system
hnomNominal embedment depthManufacturer defined
hConcrete member thickness (h_min is the minimum)Product and design specific
f’cSpecified concrete compressive strengthpsi or MPa

Concrete Anchor Spacing Standards and Codes

Three layers of rules decide anchor spacing: the structural design code, the qualification standard that tests the product, and the evaluation report for the exact product. All three can apply to one anchor.

Design codes, qualification standards and product reports serve different purposes.
DocumentRoleTypical content
ACI 318 Chapter 17Structural design of anchors to concreteTension, shear, breakout, pullout, groups, edge distance, thickness, interaction, seismic
ACI 355.2Qualification of post-installed mechanical anchorsTest requirements and performance categories, including cracked concrete
ACI 355.4Qualification of post-installed adhesive anchorsTest requirements for adhesive anchor systems
ICC-ES evaluation reportProduct-specific recognitionApproved sizes, embedments, spacing, edge distance, thickness and limits
Manufacturer dataProduct installation instructionsHole preparation, torque, embedment, hardware and conditions of use

ACI 318 Chapter 17

ACI 318 Chapter 17, Anchoring to Concrete, sets strength design for cast-in and post-installed anchors. It covers concrete breakout, group effects, edge distances, spacings and thicknesses (Section 17.9 in ACI 318-19), tension and shear interaction (17.8) and seismic design (17.10). The 2024 IBC references ACI 318-19. Section numbers change between editions, so confirm clauses against the edition your project adopts.

ACI 355.2 and ACI 355.4

These standards qualify post-installed mechanical and adhesive anchors. They do not replace the design provisions in ACI 318. They are the reason a product can publish its own minimum spacing and edge distance.

ICC-ES Evaluation Reports

For post-installed anchors, an evaluation report often states that its tabulated minimum spacing, edge distance and member thickness are used in place of the default ACI values. The Hilti KB-TZ2 report, ESR-4266, says exactly that.

Local Adoption Controls

The locally adopted code edition, project specifications, the current evaluation report and the approved structural design govern any anchor layout.

Minimum vs. Critical Anchor Spacing

These are different ideas, and mixing them up is the most common error in anchor spacing articles.

Four related but different ideas.
ConceptMeaningWhere it comes from
Minimum installation spacing (s_min)Smallest permitted center-to-center distance under the product qualificationProduct data, evaluation report, ACI 318
Critical breakout spacing (scr,N)3hef in the simplified tension breakout model, where projected areas stop overlappingACI 318 breakout geometry
Actual installed spacing (s)The distance you measure on the slabYour layout
Maximum layout spacingLargest allowed gap between anchors, such as a sill-plate ruleResidential code or design drawings

Minimum Installation Spacing

A product’s minimum spacing comes from testing. It prevents splitting and installation damage for that product. It often depends on edge distance, as the Hilti cases show.

Critical Breakout Spacing

In ACI’s tension breakout model, the projected breakout area extends about 1.5hef from the anchor axis in each direction, so two anchors 3hef apart have projected areas that just meet. This describes group interaction in one failure mode, not an installation limit.

Minimum versus critical anchor spacing, simplified tension breakout modelTwo plan views. On the left, two anchors spaced closer than 3 times the effective embedment have overlapping projected breakout squares. On the right, two anchors at a spacing of 3 times the effective embedment have projected squares that just meet.Actual spacing s less than 3hefSpacing s equals 3hefOverlapping projected area1.5hef1.5hefss = 3hef3hef (one projected square)Simplified ACI 318 tension breakout model: projected area is a square of side 3hef centered on each anchor.hef is the effective embedment depth (not visible in plan). This is geometry only, not an installation limit or a failure-cone shape.
The characteristic tension breakout spacing of 3hef describes projected concrete breakout interaction, not a universal minimum anchor spacing.

Actual Installed Spacing

An installed layout can satisfy the product’s minimum spacing and still lose breakout resistance because adjacent breakout regions overlap. Passing the minimum check is not enough; the governing failure modes must be checked.

Concrete Anchor Spacing by Anchor Type

Each anchoring mechanism loads the concrete differently, so no single 4d, 6d or 10d rule can safely represent all of them.

Qualitative comparison. No generic inch or diameter-multiple column is given on purpose.
Anchor familyHow to establish minimum spacingMain caution
Cast-in headed anchorsACI 318 design and project geometryBreakout, splitting and reinforcement
Torque-controlled expansion anchorsCurrent manufacturer data and evaluation reportExpansion-induced splitting
Drop-in anchorsProduct-specific qualification and setting requirementsInstallation and expansion effects
Concrete screw anchorsProduct-specific evaluation and designInstallation and concrete breakout
Adhesive anchorsProduct qualification, ACI design and installation requirementsBond, edge effects and group behavior
Undercut anchorsProduct qualification and ACI designMechanical interlock and breakout

Mechanical Anchors

Expansion anchors press against the hole wall, which can split concrete when anchors or edges are too close. Use the product’s evaluated spacing. Dimensions and types are in the Anchor Bolt Size Chart.

Adhesive Anchors

Bonded threaded rods transfer load through adhesive, so bond failure and concrete breakout both matter. Spacing comes from the adhesive system’s qualification and ACI 318 design.

Cast-In-Place Anchors

Headed bolts and studs are designed from geometry, load and concrete properties, with ACI 318 minimum spacing and edge distance as a floor, not a design.

Concrete Anchor Spacing by Diameter

Diameter-based searches usually want one number. The honest answer is a set of numbers tied to embedment. The table below lists every carbon-steel KB-TZ2 combination for 1/4 through 3/4 in. diameters, and the second table shows why a diameter multiple fails even within one product.

All values in inches. The 1-in. diameter anchor is also listed in the source and is not shown here. Shallow embedments require much larger distances.
Diameterhefh min.Case A: c min.Case A: s at leastCase B: s min.Case B: c at least
1/4 in.1-1/23-1/41-1/21-1/21-1/21-1/2
3/8 in.1-1/23-1/45858
3/8 in.242-1/262-1/43-1/2
3/8 in.2-1/252-1/2524
1/2 in.1-1/23-1/2812128
1/2 in.242-3/45-1/23-1/210
1/2 in.2-1/252-3/49-3/438
1/2 in.3-1/45-1/22-1/45-1/424-3/4
5/8 in.2-3/454-1/26-1/24-1/25-1/2
5/8 in.3-1/45-1/23-1/25-1/22-3/47
5/8 in.462-3/47-1/42-1/44-1/4
3/4 in.3-1/45-1/25104-1/26
3/4 in.3-3/4645-3/43-3/47-1/4
3/4 in.4-3/483-1/25-1/23-3/44-3/4

Source: Hilti KWIK BOLT TZ2 (KB-TZ2) carbon steel. Data edition: ICC-ES ESR-4266 (reissued December 2023, revised October 2024), Table 3, and Hilti North American Product Technical Guide, Volume 2, Edition 22, Table 5.

1/4- and 3/8-Inch Anchors

The 1/4 in. anchor lists 1-1/2 in. for both edge and spacing at 1-1/2 in. embedment. The 3/8 in. anchor ranges from 2 in. to 8 in. depending on embedment and case. At 2 in. embedment its minimum spacing is 2-1/4 in. only when the edge distance is at least 3-1/2 in.

1/2-Inch Anchors

At 2 in. embedment, the 1/2 in. anchor needs 3-1/2 in. spacing with a 10 in. edge distance (Case B) or a 2-3/4 in. edge distance with 5-1/2 in. spacing (Case A). Other embedments change both numbers, so identify hef first.

5/8- and 3/4-Inch Anchors

Larger diameters use deeper embedments and larger distances. Compare rows within one embedment only.

Derived: table value divided by nominal diameter da. Shows why one multiple cannot describe an anchor.
AnchorCase A spacingCase B spacingCase A edgeCase B edge
3/8 in., hef 2 in.16.0da (6 in.)6.0da (2-1/4 in.)6.7da (2-1/2 in.)9.3da (3-1/2 in.)
1/2 in., hef 2 in.11.0da (5-1/2 in.)7.0da (3-1/2 in.)5.5da (2-3/4 in.)20.0da (10 in.)
1/4 in., hef 1-1/2 in.6.0da (1-1/2 in.)6.0da (1-1/2 in.)6.0da (1-1/2 in.)6.0da (1-1/2 in.)

Anchor products, drill sizes and installation are covered in the Wedge Anchor Size Chart and the Concrete Anchor Drill Bit Size Chart.

Concrete Anchor Edge Distance Chart

Concrete edge distance is measured from the anchor centerline to the nearest free concrete edge. It is not the distance to a steel base-plate edge, a fixture hole, a sill-plate end, reinforcement or the clear spacing between anchors.

Minimum Edge Distance

The minimum edge distance is the smallest value permitted for installation, and for a product like the KB-TZ2 it depends on spacing.

Critical Edge Distance

Critical edge distance cac is different: it is the distance beyond which edge effects on splitting no longer reduce uncracked concrete breakout strength where supplementary reinforcement is absent. For the 3/8 in. KB-TZ2 at 2 in. embedment, the minimum edge distance is 2-1/2 in. but cac is 4-3/8 in. When c is less than cac, ESR-4266 requires a further reduction factor.

Critical edge distance cac is listed in the same evaluation report (Table 4).
AnchorCase A minimum edge distanceCase B edge distance for min. spacingCritical edge distance cac
3/8 in., hef 2 in.2-1/2 in. (with s at least 6 in.)3-1/2 in. (with s at least 2-1/4 in.)4-3/8 in.
1/2 in., hef 2 in.2-3/4 in. (with s at least 5-1/2 in.)10 in. (with s at least 3-1/2 in.)5-1/2 in.

Source: Hilti KWIK BOLT TZ2 (KB-TZ2) carbon steel. Data edition: ICC-ES ESR-4266 (reissued December 2023, revised October 2024), Table 3, and Hilti North American Product Technical Guide, Volume 2, Edition 22, Table 5.

Measuring Concrete Edges

Measure to every relevant free edge, including slab ends, openings and re-entrant corners. In a corner, two edge distances apply at once.

Worker measuring concrete anchor edge distance with a tape measure from the anchor bolt centerline to the concrete foundation edge beside a steel column base plate.
Illustration showing how to measure concrete anchor edge distance from the centerline of an anchor bolt to the nearest concrete edge. The example features a steel column base plate, anchor bolts, a tape measure, and an inset diagram identifying the correct measurement points.

How Edge Distance Affects Anchor Spacing

For many anchors, the minimum spacing and the minimum edge distance cannot be chosen independently. The Hilti KB-TZ2 lists two permitted combinations, and a layout must satisfy both numbers of one combination.

Conditional Manufacturer Limits

Case A favors a smaller edge distance; Case B favors a smaller spacing. Hilti advises following the other parameter in whichever case you use, and mixing the cases is not recommended.

Hilti KB-TZ2 Examples

Geometry check only. A geometry pass is not a capacity approval. Case E is derived by linear interpolation.
Installation caseActual edge distanceActual anchor spacingPreliminary geometry result
A2-1/2 in.6 in.Meets published Case A limits
B3-1/2 in.2-1/4 in.Meets published Case B limits
C2-1/2 in.2-1/4 in.Cannot be accepted by combining the two cases
D4 in.6 in.Exceeds both conditional minimum combinations
E3 in.4-1/2 in.Permitted by interpolation (minimum s at c = 3 in. is 4-1/8 in.)
Hilti KB-TZ2 Case A and Case B edge distance and spacing combinationsTwo side-by-side layouts of two 3/8 inch Hilti KB-TZ2 carbon steel anchors at 2 inch effective embedment, drawn at 40 units per inch. Case A has a 2-1/2 inch edge distance and 6 inch spacing. Case B has a 3-1/2 inch edge distance and 2-1/4 inch spacing.Case A: c 2-1/2 in., s 6 in.Free concrete edge at leftc = 2-1/2 in.s = 6 in.Case B: c 3-1/2 in., s 2-1/4 in.Free concrete edge at leftc = 3-1/2 in.s = 2-1/4 in.Hilti KB-TZ2 carbon steel, 3/8 in. diameter, hef = 2 in., member thickness at least 4 in. Drawn at 40 units = 1 in.Each case is a separate permitted pair. Do not combine the edge distance of one case with the spacing of the other.
Two published Hilti KB-TZ2 spacing and edge-distance combinations demonstrate why anchor layout limits must be evaluated together.

Source: Hilti KWIK BOLT TZ2 (KB-TZ2) carbon steel. Data edition: ICC-ES ESR-4266 (reissued December 2023, revised October 2024), Table 3, and Hilti North American Product Technical Guide, Volume 2, Edition 22, Table 5.

Interpolation Requirements

ESR-4266 permits additional combinations by linear interpolation between the two boundary values, and Hilti’s technical guide gives the same method. The straight-line calculation below shows how.

Interpolating Between Case A and Case B

s_min = s2 + (s1 – s2) × (c – c2) ÷ (c1 – c2)

Variables: c1, s1 = Case A edge distance and spacing; c2, s2 = Case B edge distance and spacing; c = actual edge distance between c1 and c2

Given: 3/8 in. KB-TZ2, hef = 2 in. Case A: c1 = 2.5 in., s1 = 6 in. Case B: c2 = 3.5 in., s2 = 2.25 in. Actual edge distance c = 3 in.
1
s_min = 2.25 + (6 – 2.25) × (3 – 3.5) ÷ (2.5 – 3.5)
2
s_min = 2.25 + 3.75 × 0.5 = 4.125 in.
Result: minimum spacing at a 3 in. edge distance is about 4-1/8 in.

Practical interpretation: The permitted spacing climbs smoothly from 2-1/4 in. at a 3-1/2 in. edge distance to 6 in. at a 2-1/2 in. edge distance. Interpolation applies only between the two published cases, never outside them.

Anchor Embedment Depth and Spacing

Effective vs. Nominal Embedment

Spacing formulas use effective embedment hef, which is not the same as nominal embedment hnom or the drilled depth. Using the wrong depth shifts every breakout calculation.

Product example. Always use the manufacturer’s definition of each depth.
TermMeaningValue
Effective embedment hefEffective embedment depth used in design, as the manufacturer defines it2 in.
Nominal embedment hnomManufacturer-defined installed depth2-1/2 in.
Minimum hole depth hoDrilled depth required2-3/4 in.

Source: Hilti KWIK BOLT TZ2 (KB-TZ2) carbon steel. Data edition: ICC-ES ESR-4266 (reissued December 2023, revised October 2024), Table 3, and Hilti North American Product Technical Guide, Volume 2, Edition 22, Table 5. (Table 1, setting information).

Critical Spacing Formula

The standard tension breakout model projects a region of about 1.5hef from the anchor axis. Two anchors whose projected regions just meet are 2 × 1.5hef = 3hef apart.

Simplified ACI tension breakout geometry. Not a universal minimum spacing.
Effective embedment hef1.5hef projected distance3hef characteristic spacing
1-1/2 in.2-1/4 in.4-1/2 in.
2 in.3 in.6 in.
2-1/2 in.3-3/4 in.7-1/2 in.
3 in.4-1/2 in.9 in.
4 in.6 in.12 in.
5 in.7-1/2 in.15 in.
6 in.9 in.18 in.

Worked Example

Characteristic Tension Breakout Spacing

scr,N = 3 × hef

Variables: scr,N = characteristic spacing (in.); hef = effective embedment depth (in.)

Given: hef = 4 in.
1
scr,N = 3 × 4
2
scr,N = 12 in.
Result: 12 in. characteristic spacing for the simplified model

Practical interpretation: Twelve inches is where the idealized projected areas stop overlapping for tension breakout. It is not necessarily the minimum permitted installation spacing, and it does not cover splitting, shear, bond or complete group capacity.

Concrete Thickness and Anchor Spacing

An anchor can meet its spacing and edge-distance requirements and still be wrong for a thin member. The minimum thickness comes from the product data or the governing design, never from the spacing chart.

Minimum Member Thickness

For the KB-TZ2, ESR-4266 lists minimum thickness by diameter and embedment and requires it in place of the default ACI value. A larger spacing does not substitute for adequate thickness.

Hole Depth

The hole is deeper than the embedment, so the concrete left below the hole is smaller than the slab thickness suggests. For a 3/8 in. anchor at 2 in. embedment in a 4 in. slab, the hole is 2-3/4 in. deep and 1-1/4 in. of concrete remains.

The last column is derived at the minimum thickness: h minus ho.
DiameterhefMin. thickness hMin. hole depth hoConcrete left below hole (h – ho)
3/8 in.2 in.4 in.2-3/4 in.1-1/4 in.
3/8 in.2-1/2 in.5 in.3-1/4 in.1-3/4 in.
1/2 in.2 in.4 in.2-3/4 in.1-1/4 in.
1/2 in.2-1/2 in.5 in.3-1/4 in.1-3/4 in.

Source: Hilti KWIK BOLT TZ2 (KB-TZ2) carbon steel. Data edition: ICC-ES ESR-4266 (reissued December 2023, revised October 2024), Table 3, and Hilti North American Product Technical Guide, Volume 2, Edition 22, Table 5. Remaining concrete is calculated.

Thin Concrete Members

Check reinforcement, post-tensioning and embedded services before drilling a thin slab or wall. Cover values alone do not show where it is safe to drill. See the Concrete Cover Chart for reinforcement cover context.

Cracked vs. Uncracked Concrete

Concrete may be treated as cracked or uncracked for anchor design depending on the structure and analysis. The assumption changes which products can be used and how much resistance they have.

Product examples are from ESR-4266 and are not general rules.
ItemWhat changesWhat to check
Product qualificationAnchors are tested and qualified for cracked, uncracked or both conditionsCheck the evaluation report for the exact product
Design resistanceBreakout and pullout use different effectiveness factors for cracked and uncracked concreteDo not use uncracked data in cracked concrete
Seismic designSeismic design requires anchors qualified for seismic loading and the ACI seismic provisionsACI 318 Section 17.10 and the product report
Concrete strengthReports state a permitted f’c rangeKB-TZ2: 2,500 to 8,500 psi per ESR-4266

Qualification

The KB-TZ2 is evaluated for cracked and uncracked concrete and Seismic Design Categories A through F. Some products are qualified for uncracked concrete only, so approval cannot be inferred from the anchor’s diameter or appearance.

Design Resistance

The KB-TZ2’s minimum spacing and edge-distance table is the same for both conditions, but its design strength uses separate cracked and uncracked factors. The concrete must reach its minimum design strength before anchors are installed; see the Concrete PSI Chart for strength classes.

Seismic Considerations

Seismic loading requires ACI 318 Section 17.10 provisions and a seismic-qualified anchor.

Mechanical Expansion Anchor Spacing

Torque-controlled anchors, such as wedge and sleeve anchors, expand when the nut is tightened. Displacement-controlled anchors, such as drop-in anchors, expand when a setting tool drives an internal plug. Both push outward on the hole wall.

Wedge Anchors

The KB-TZ2 is a torque-controlled expansion anchor. Its spacing and edge distance come from its evaluation report, as shown in the main chart. See the Wedge Anchor Size Chart for dimensions and installation.

Sleeve Anchors

Sleeve anchors spread load along a sleeve and use product-specific spacing. Check the Sleeve Anchor Size Chart and the manufacturer’s data.

Drop-In Anchors

Drop-in anchors have an internal thread and set by driving an expansion plug. See the Drop-In Anchor Size Chart and the product’s setting requirements.

Expansion-Induced Splitting

Expansion pressure can split concrete when edge distance or spacing is too small, which is why products publish minimums. Use the manufacturer’s evaluated numbers, not a diameter multiple.

Concrete Screw Anchor Spacing

Concrete screws cut their own threads into a drilled hole, so their geometry, hole size and embedment are product-specific. The Concrete Screw Size Chart covers dimensions.

Installation Requirements

Use the specified bit, hole depth and cleaning method, and follow the manufacturer’s instructions on whether a screw may be removed and reinstalled.

Minimum Spacing

Concrete screws publish their own minimum spacing by diameter and embedment. Do not assume the minimum spacing for a wedge anchor applies to a screw.

Edge Distance

Edge distance, member thickness and concrete breakout also come from the screw’s evaluation report and ACI 318 design.

Adhesive Anchor Spacing

Adhesive anchors are threaded rods or rebar set in a drilled hole with an approved adhesive.

Bonded Threaded Rods

Use an adhesive system qualified under ACI 355.4 with suitable threaded elements, correct hole diameter and cleaning, and the specified cure time and temperature. Material grades are in the Anchor Bolt Grade Chart.

Group Effects

Adhesive anchors can fail by concrete breakout, by bond failure, or by steel failure. The bond influence area can overlap at spacings that do not overlap the concrete breakout region, so both are checked. Minimum installation spacing is a different matter from calculated group strength.

Installation Conditions

Hole cleaning, moisture, temperature and cure time change performance. Follow the product report and instructions exactly.

Cast-In-Place Anchor Spacing

Cast-in anchors are set before the concrete is placed. Their spacing and edge distance come from design geometry, load and ACI 318, and reinforcement can change breakout behavior.

Headed Anchors

ACI 318-19 sets minimum geometry for headed bolts, shown below. These are lower bounds, and design usually requires much more.

Cast-in anchors only. Do not apply to post-installed anchors. Verify against the ACI 318 edition adopted for the project.
ParameterAnchors not torquedAnchors torqued
Minimum center-to-center spacing4da6da
Minimum edge distanceCover for reinforcement per ACI 318 Section 20.5.1.36da

Anchor Rod Groups

Anchor rod groups under steel columns are designed for tension, shear and breakout as a group. Reinforcement, headed-stud details and anchor material affect the result.

Concrete Breakout

The same 1.5hef breakout geometry applies to cast-in headed anchors. Do not use post-installed anchor installation tables for cast-in anchors.

Concrete Anchor Group Effects

A group of anchors does not simply multiply one anchor’s capacity. When breakout regions overlap, the shared concrete is counted once, so four anchors do not give four times the strength of one isolated anchor.

Two-Anchor Groups

Two anchors spaced closer than 3hef share part of their projected area, as the earlier diagram shows.

Four-Anchor Groups

Four-anchor patterns overlap in both directions, and base plates add load eccentricity.

Overlapping Breakout Regions

Projected Breakout Area for a Two-Anchor and a Four-Anchor Group (reference geometry)

ANc = (3hef + s) × 3hef for two anchors; ANc = (3hef + sx) × (3hef + sy) for four

Variables: hef = effective embedment; s, sx, sy = center-to-center spacings; ANco = 9hef² for one isolated anchor; group value is limited to n × ANco

Given: hef = 2 in., no nearby edges; two anchors at s = 4 in.; four anchors at sx = sy = 4 in.
1
Single anchor ANco = 9 × 2² = 36 in²
2
Two anchors: ANc = (6 + 4) × 6 = 60 in²; n × ANco = 72 in²; ratio = 60 ÷ 72 = 0.83
3
Four anchors: ANc = (6 + 4) × (6 + 4) = 100 in²; n × ANco = 144 in²; ratio = 100 ÷ 144 = 0.69
Result: overlapping regions leave about 83% (two anchors) and 69% (four anchors) of the projected area of isolated anchors

Practical interpretation: This is a geometric reference ratio from the simplified model. The group strength also needs edge, eccentricity, cracking and other ACI factors, so do not read these ratios as capacity.

Group Eccentricity

When the load is not centered on the group, anchors carry unequal shares and ACI applies an eccentricity factor.

TOOLS & EQUIPMENT

Equipment for Your Project

Affiliate disclosure: As an Amazon Associate, ConcreteCalculate earns from qualifying purchases. We may also earn a commission from other affiliate links at no additional cost to you.

Concrete Anchor Spacing Under Tension

Tension spacing is mainly a breakout question: how much concrete the anchors engage and whether their regions overlap.

Concrete Breakout

ACI 318 calculates breakout strength from the projected area compared with the single-anchor reference area, then applies modification factors. For the KB-TZ2, ESR-4266 requires ACI 318-19 Section 17.6.2 with its own effectiveness factors for cracked and uncracked concrete.

Projected Area

Reference Projected Breakout Area for One Anchor

ANco = 9 × hef²

Variables: ANco = projected tension breakout area of a single anchor far from edges (in²); hef = effective embedment (in.)

Given: hef = 2 in.
1
ANco = 9 × 2²
2
ANco = 9 × 4 = 36 in²
Result: 36 in² of reference projected breakout area

Practical interpretation: This is a geometric quantity, not a strength value. Group projected areas, edge truncation, eccentricity and other ACI factors require the governing code procedure, so do not use it to claim an allowable load.

Strength Limitations

Steel strength and pullout strength can govern instead of breakout. The design strength is the lowest of all applicable failure modes, and spacing is only one input.

Concrete Anchor Spacing Under Shear

Shear is governed by the edge, not by the 3hef relationship. Tension characteristic spacing does not apply as a universal shear-spacing rule.

Shear Toward a Concrete Edge

An anchor loaded toward a nearby free edge can break out a wedge of concrete toward that edge. Edge distance in the load direction is the key variable.

Reference Projected Shear Breakout Area, Single Anchor Near an Edge

AVco = 4.5 × ca1²

Variables: AVco = reference projected shear breakout area (in²); ca1 = edge distance in the shear direction (in.)

Given: ca1 = 3 in.
1
AVco = 4.5 × 3²
2
AVco = 4.5 × 9 = 40.5 in²
Result: 40.5 in² reference shear breakout area

Practical interpretation: The shear area grows with the square of the edge distance, which is why edge distance dominates shear. This is reference geometry only, not a strength or a spacing rule. Confirm the formula in the adopted ACI 318 edition.

Shear Parallel to an Edge

Load parallel to an edge is treated differently from load toward an edge, and ACI allows a larger shear strength for that direction.

Pryout and Group Behavior

Shallow anchors can pry out a cone of concrete behind the anchor, which is checked with a pryout coefficient. Groups near an edge also share the edge breakout region. For the KB-TZ2, the load bearing length of the anchor in shear is limited to the lesser of hef or 8da.

Combined Tension and Shear

Anchors often carry tension and shear at once, so spacing is only one check in the anchorage design.

Interaction

ACI 318 Section 17.8 allows full tension strength when the shear demand is no more than 20% of the design shear strength, and full shear strength when the tension demand is no more than 20% of the design tension strength. Otherwise, the sum Nua / φNn + Vua / φVn must not exceed 1.2.

Governing Failure Modes

Steel, breakout, pullout and pryout are all checked in tension and shear, and the lowest governs.

Design Requirements

Use the ACI 318 interaction requirements and the product report. Do not invent a universal allowable load.

Anchor Spacing for Steel Base Plates

A steel column base plate over a concrete pedestal connects two systems. The plate geometry controls where the holes are, and the concrete controls how close the anchors can be to each other and to the edges.

A four-anchor base plate has to satisfy both the steel connection and the concrete anchorage.
CheckWhat is verifiedAuthority
Steel platePlate size, thickness, hole diameter and hole positionSteel design and AISC requirements
Anchor spacing sx, syMeets the product minimum and the design layoutEvaluation report, ACI 318
Concrete edge distances c1, c2Checked at every free edge, including cornersEvaluation report, ACI 318
Group breakoutOverlapping tension breakout regions in the groupACI 318 Chapter 17
Shear and pryoutLoad direction and edge effectsACI 318 Chapter 17
InteractionCombined tension and shearACI 318 Section 17.8

Bolt Patterns

The hole pattern must match the anchor layout. Fixture hole diameters are product-specific; the KB-TZ2 lists 7/16 in. for the 3/8 in. anchor and 9/16 in. for the 1/2 in. anchor. Plate material, plate thickness and member shape come from the structural design.

Concrete Edges

Check the distance from every anchor to every free edge of the pedestal, not to the plate edge.

Structural Loads

Four equally spaced anchors do not automatically give enough resistance. The group must be designed for the applied loads and moments.

This page does not publish a code-approved bolt pattern. The pattern comes from the structural design.

Anchor Spacing for Equipment Foundations

Equipment anchors sit under dynamic and vibratory loads that static anchor tables do not cover.

Equipment Patterns

The equipment manufacturer sets the base hole pattern, and the engineer sets the anchors.

Vibration

Some mechanical anchor evaluations state that fatigue and shock loading are outside their scope. ESR-4266 says this directly for the KB-TZ2.

Engineered Design

Do not use residential sill-plate spacing or any universal rule for pumps, motors, generators or machinery. Concrete thickness and installation tolerances also need checking.

Anchor Spacing for Guardrails and Post Bases

Guardrails and post bases are safety-critical, and loads are applied at the top of the post, which creates large moments at the anchors.

Edge Locations

Anchors near slab edges and corners have the least concrete to resist shear and breakout. Such locations may need a specialized design or a different connection detail.

Lateral Loads

Guardrail loads come from the governing code and must be carried by a qualified anchorage design.

Safety Requirements

No Automatic Safe Layouts

Do not present a diameter-and-spacing combination as automatically safe for a guardrail. Anchor type, embedment, edge distance and thickness must come from the engineered design.

Residential Foundation Anchor Bolt Spacing

The 2024 IRC prescriptive rule for sill-plate anchorage is a maximum on-center spacing, normally 6 feet, together with end-distance, bolt-count, diameter and embedment requirements and additional rules for higher wind and seismic conditions.

Brief comparison only.
Topic2024 IRC sill platesACI 318 and product data
SpacingMaximum 6 ft on center for ordinary sill-plate anchorageMinimum spacing from product data and ACI 318
PurposeResidential foundation sill-plate attachmentEngineered anchor group in concrete
Direction of controlUpper bound on gaps between boltsLower bound on closeness and group behavior

IRC Rules and Sill Plates

That limit controls how far apart bolts may be. It says nothing about how close two post-installed anchors may be.

Difference from ACI Minimum Spacing

ACI minimum spacing and edge distance protect the concrete. For complete foundation anchorage, use the Anchor Bolt Spacing Chart.

Concrete vs. Masonry Anchor Spacing

Many anchor products publish separate tables for concrete and masonry. A spacing value from a masonry table is not a generic minimum for cast concrete.

Scope comparison. Numbers are intentionally not shown.
Base materialWhere spacing data comes fromCaution
Cast concreteProduct-specific minimums in the concrete evaluation reportDo not reuse masonry numbers
Grout-filled CMUSeparate masonry evaluation report and tablesValues depend on masonry conditions
Hollow masonrySeparate qualificationDo not apply concrete or grouted values

Cast Concrete

Use the concrete evaluation report. For the KB-TZ2 that is ESR-4266.

Grout-Filled CMU

The KB-TZ2 has a separate evaluation for grout-filled concrete masonry, with its own installation and spacing tables.

Product Qualifications

Masonry values depend on the wall construction and the stated conditions.

How to Calculate Anchor Spacing

Three of these formulas are geometry only (center-to-center, clear spacing and edge distance). The critical spacing formula relates to concrete breakout analysis and is not an installation limit.

Center-to-Center Formula

Center-to-Center Spacing

s = |x2 – x1|

Variables: x1, x2 = measured anchor centerline positions along one line (in.)

Given: Anchor 1 at 4 in., anchor 2 at 10 in.
1
s = |10 – 4|
Result: 6 in. on center

Practical interpretation: This is a measurement, not a design approval.

Clear Spacing Formula

Clear Spacing

s_clear = s – da

Variables: s = center-to-center spacing; da = nominal anchor diameter

Given: Two nominal 1/2 in. anchors at 4 in. on center
1
s_clear = 4 – 0.5
Result: 3-1/2 in. nominal clear shaft spacing

Practical interpretation: This is shaft clearance, not the clearance between oversized holes, expansion components, washers or base-plate holes.

Critical Spacing Example

Critical Tension Breakout Spacing

scr,N = 3 × hef

Variables: hef = effective embedment

Given: hef = 2.5 in.
1
scr,N = 3 × 2.5
Result: 7-1/2 in. characteristic spacing

Practical interpretation: Do not call this a universal minimum spacing.

Edge Distance

c = |x – xe|

Variables: x = anchor center coordinate; xe = concrete edge coordinate

Given: Anchor centerline 3 in. from the edge
1
c = 3 in.
Result: 3 in. edge distance

Practical interpretation: For a real base plate, check every relevant free edge.

Preliminary Anchor Count Along a Line

N = ceil(Lu ÷ s_max) + 1

Variables: Lu = usable distance between first and last anchor centers; s_max = design-specified maximum spacing

Given: Lu = 48 in., s_max = 12 in.
1
N = ceil(48 ÷ 12) + 1
2
N = 4 + 1
Result: 5 anchor positions at or below the maximum spacing

Practical interpretation: This only counts positions after a legitimate maximum spacing is set. It does not determine strength, minimum spacing, edge distance or group capacity.

How to Lay Out Concrete Anchors

Confirm the Approved Anchor System

  1. Review the approved plans and loads.
  2. Identify the exact anchor product.
  3. Confirm the concrete condition and thickness.
  4. Obtain the product’s minimum spacing and edge-distance requirements.

Mark Anchor Centerlines and Check Edges

  1. Mark anchor centerlines.
  2. Check all relevant concrete edges.
  3. Verify base-plate hole geometry.

Check Reinforcement and Services

  1. Locate reinforcement and embedded services.
  2. Confirm drilling or cast-in-place installation requirements.
  3. Inspect the layout before installation.

Select the drill size from the Concrete Anchor Drill Bit Size Chart and the product instructions. Do not drill through reinforcement or post-tensioning tendons without an approved procedure; the Concrete Cover Chart does not show where it is safe to drill.

Construction worker marking anchor bolt centerlines on a concrete slab using steel base plate templates, a tape measure, and layout tools to illustrate anchor spacing and edge distance.
A construction worker marks anchor bolt drilling locations on a concrete foundation using steel base plate templates. The illustration highlights center-to-center anchor spacing, anchor centerlines, and edge distance measurements required for accurate concrete anchor installation.

Common Concrete Anchor Spacing Mistakes

Universal-Rule Errors

Using a universal 4d or 6d rule

Spacing comes from the product and design, not a multiple.

Confusing minimum and critical spacing

3hef is a breakout geometry, not an installation limit.

Measuring from anchor edges

Spacing is centerline to centerline.

Measuring edge distance from the fixture edge

Measure to the concrete edge.

Ignoring effective embedment

hef, hnom and hole depth are different.

Edge and Embedment Errors

Combining incompatible table cases

Meet both numbers within the same case or interpolate.

Applying masonry values to concrete

Use the concrete report.

Ignoring concrete thickness

Spacing does not make up for thin members.

Assuming closer anchors are always stronger

Overlap can reduce group breakout.

Treating anchor capacities as additive

Groups share the same concrete.

Anchor Group Errors

Ignoring load direction

Shear toward an edge behaves differently.

Using uncracked data in cracked concrete

Check the product qualification.

Assuming an anchor is seismic-qualified

Confirm seismic qualification.

Ignoring torque and hole cleaning

Follow the installation instructions.

Using sill-plate spacing for equipment

That is a different problem.

Installing anchors too close to corners

Two edges apply at once.

Using an outdated evaluation report

Check the current report for the exact product.

Concrete Anchor Spacing Inspection Checklist

Geometry

Verify diameter, embedment, spacing, edge distances and thickness against the approved plans before drilling and again after installation.

Product Requirements

Check the exact product, the concrete condition and strength, hole preparation and the setting procedure.

Recommended field-check table.
Inspection itemRequired verification
Anchor typeExact manufacturer and model
Anchor diameterMatches design
EmbedmentMeets approved specification
Center-to-center spacingMeets evaluated and design limits
Edge distanceChecked at every relevant edge
Concrete thicknessMeets minimum requirement
Concrete conditionCracked or uncracked as specified
Concrete strengthMeets design requirements
DrillingCorrect bit, depth and hole preparation
InstallationSpecified setting or torque procedure
Anchor groupRequired capacity verified
DocumentationApproved plans and applicable evaluation report

Documentation

Keep the approved plans and the current evaluation report on site. The ESR requires special inspection of anchor type, spacing, edge distance, thickness, torque, hole dimensions and embedment where applicable.

Chart Limitations and Engineering Safety

Reference vs. Structural Design

This chart does not independently establish structural anchor capacity, complete ACI compliance, seismic suitability, concrete breakout resistance, adhesive bond resistance, anchor-group strength, adequate reinforcement, the minimum concrete thickness for every system, or safe equipment or guardrail anchorage.

The Design, Evaluation Report and Local Code Control

The governing structural design, the current product evaluation, the installation instructions and the locally adopted code control. The KB-TZ2 values above are one product example from the cited edition; verify the current data before use.

Code and Evaluation Requirements

Evaluation reports expire and are reissued, so confirm that the report you rely on is current for the exact product.

Primary References

Anchor material and strength grades are in the Anchor Bolt Grade Chart,.

Concrete Anchor Spacing FAQs

Minimum Spacing

What is the minimum spacing between concrete anchors?

There is no universal minimum. It depends on the anchor system, embedment, edge distance, concrete thickness and installation conditions. For example, the Hilti KB-TZ2 3/8 in. anchor at 2 in. embedment allows 2-1/4 in. spacing only when the edge distance is at least 3-1/2 in., or requires 6 in. spacing at a 2-1/2 in. edge distance.

How far apart should wedge anchors be?

Follow the specific wedge anchor’s evaluation report. For the Hilti KB-TZ2, spacing ranges from 1-1/2 in. to 12 in. depending on diameter, embedment and edge distance. Other wedge anchors have different values.

What is the minimum spacing for 3/8-inch concrete anchors?

For the Hilti KB-TZ2 carbon steel 3/8 in. anchor, the minimum is 2 in. at 2-1/2 in. embedment with an edge distance of at least 4 in., and 2-1/4 in. at 2 in. embedment with an edge distance of at least 3-1/2 in. Other 3/8 in. products can differ.

What is the minimum spacing for 1/2-inch concrete anchors?

For the KB-TZ2 1/2 in. anchor, minimum spacing is 3-1/2 in. at 2 in. embedment with an edge distance of at least 10 in., or 3 in. at 2-1/2 in. embedment with an edge distance of at least 8 in. Smaller edge distances require larger spacings in the same table.

Is 4d a universal minimum anchor spacing?

No. ACI 318-19 lists 4da as the minimum spacing only for cast-in anchors that are not torqued. Post-installed anchors use their evaluated values, which can be much larger.

What does 6d anchor spacing mean?

It means six anchor diameters, center to center. ACI 318-19 uses 6da for torqued cast-in anchors. It is not a general rule for post-installed anchors; at 2 in. embedment the KB-TZ2 3/8 in. anchor ranges from 6 to 16 anchor diameters depending on the case.

What is the difference between minimum and critical spacing?

Minimum spacing is the smallest permitted installation distance for a product. Critical spacing, such as 3hef in the simplified tension breakout model, is where the projected breakout areas stop overlapping. Critical spacing is not an installation limit.

How is anchor spacing measured?

From the centerline of one anchor to the centerline of the next. Clear spacing, which subtracts the anchor diameter, is a different value.

How close can a concrete anchor be to an edge?

It depends on the product and on the spacing. The KB-TZ2 3/8 in. anchor at 2 in. embedment can be 2-1/2 in. from an edge when spaced at least 6 in. from the next anchor. Check every free edge.

Does embedment affect anchor spacing?

Yes. Deeper effective embedment widens the projected breakout area (3hef characteristic spacing) and changes the product’s minimums. Shallow embedments often require larger distances.

Can concrete anchors be installed 2 inches apart?

Only if the specific product’s data permits it. For the KB-TZ2 3/8 in. anchor at 2-1/2 in. embedment, 2 in. spacing is listed only when the edge distance is at least 4 in. Closer anchors also reduce group breakout resistance.

Does concrete strength affect anchor spacing?

The KB-TZ2 minimum spacing and edge-distance table is not given as a function of concrete strength. Strength affects design resistance and the product’s permitted range, 2,500 to 8,500 psi for the KB-TZ2.

Can anchors be closer together in stronger concrete?

Not based on strength alone. Use the minimums in the evaluation report for the product, and check group breakout in the design.

How does cracked concrete affect anchor spacing?

Cracking mainly changes design resistance and which products may be used. The KB-TZ2 lists one spacing and edge-distance table for both conditions, but it uses separate design factors for cracked and uncracked concrete.

Do adhesive anchors require different spacing?

Yes. Adhesive anchors are checked for bond as well as concrete breakout and their minimums come from the adhesive system’s qualification and ACI 318 design.

Do concrete screws follow the same spacing as wedge anchors?

No. Concrete screws have product-specific geometry, embedment and evaluation, so their spacing is taken from their own reports.

Does anchor spacing affect load capacity?

Yes. Overlapping breakout regions reduce group strength. In a simplified example with hef = 2 in. and no edges, two anchors at 4 in. spacing share a projected area of 60 in² versus 72 in² for two isolated anchors.

How are four-anchor base plates checked?

The steel plate geometry, anchor spacing, edge distances, group breakout in tension, shear breakout and pryout, and tension-shear interaction are all checked against the structural design and the product report.

What is the difference between concrete anchor spacing and foundation anchor bolt spacing?

Foundation anchor bolt spacing in the 2024 IRC is a maximum, normally 6 ft on center. Concrete anchor spacing for engineered anchors concerns minimum spacing, edge distance and group behavior.

Which code governs concrete anchor spacing?

ACI 318 Chapter 17 governs anchor design where the building code adopts it, and the current evaluation report for the exact product supplies its minimum spacing, edge distance and thickness. The locally adopted code edition controls.

Download Concrete Anchor Spacing Chart PDF

Use your browser’s print function to save this page as a PDF for jobsite binders and design files. The printed version hides interactive elements and keeps the tables.

Print-ready letter formatManufacturer-identified spacing tablesWorked formulasInstant browser PDF

Cite or Embed This Chart

Reference this concrete anchor spacing chart on your own site or article. Copy the citation below and link back to this page.

<p>Concrete Anchor Spacing Chart via <a href="https://concretecalculate.com/concrete-anchor-spacing-chart/">ConcreteCalculate.com</a></p>