How to Order Ready-Mix Concrete: Supplier Call Checklist
To order ready-mix concrete, calculate the volume, add a modest ordering allowance, then tell the supplier the address, mixture requirements, placement method, delivery rate, and site access. Order to the project specification, not PSI alone, and check the delivery ticket before the truck discharges.
A good order covers three things: how much concrete, what kind of concrete, and how it will be delivered and placed. This guide walks through each in the order you would raise them on the phone.
It ends with the checks that matter once the first truck arrives.
- Do not order by PSI alone. Slump, aggregate size, air, admixtures, and placement method all shape the order.
- Do not call the ordering allowance waste. NRMCA suggests about 4% to 10% above plan quantity for contingencies, and most of it may be placed.
- Do not use an automatic 90-minute rejection rule. Check the time limit that applies to your order and ticket.
- Space trucks by placement rate: truck load ÷ placement rate × 60 gives minutes between trucks.
What Information Do You Need to Order Ready-Mix Concrete?
Before you call, have the job address, what you are pouring, the required mixture, the quantity, the delivery date and time, the placement method, the truck interval, and the access conditions.
NRMCA CIP 31 says the purchaser should communicate the project requirements, quantity, delivery address, nature of the pour, placement method, delivery rate, and estimated delivery time and pour duration.
A ready-mix order needs the concrete requirements and the delivery plan, not just the number of cubic yards.
| Information | What to have ready |
|---|---|
| Customer or company | Name and account |
| Job location | Exact address |
| Placement | Slab, wall, footing, driveway, and so on |
| Mix | Approved mix ID or designation if available |
| Strength | Project requirement |
| Aggregate | Specified size |
| Slump or slump flow | Project requirement |
| Air | Exposure or specification requirement |
| Admixtures or fibers | If required |
| Quantity | Ordered yd³ |
| Placement method | Chute, pump, or buggy |
| Delivery date | Requested date |
| Start time | Requested time |
| Placement rate | yd³ per hour |
| Truck interval | Planned spacing |
| Access limitations | Tell the dispatcher |
| Special testing | If applicable |
“This is [name] with [company or account]. I need [quantity] cubic yards of [mix ID or description] for a [slab, footing, driveway] at [address].”
“I need [strength, slump, air, aggregate size, and any fibers or admixtures]. We will place it by [chute or pump] at about [rate] cubic yards per hour, starting at [time] on [date].”
“Access is [describe it]. What truck load size will you send, and what are your minimum, short-load, and standby charges?”
The NRMCA and ASCC ordering checklist from NRMCA and ASCC follows the same logic and is a useful companion if you place orders often.
Find the Project Concrete Specification First
Start with the project documents. Check the structural drawings, concrete notes, mix schedule, approved mix submittal, and any engineer requirements, and give the supplier a copy of the specification if one applies, as NRMCA CIP 31 advises.
If a mix ID or designation is specified, use it. Do not substitute a generic PSI mix without approval.
For ordinary residential work with no engineered specification, tell the supplier the application and exposure conditions and ask which standard local mixture they recommend. Do not invent water-cement ratios, cement contents, or admixture doses without a design basis.
NRMCA says the preferred way to order is by measurable performance requirements, because the producer is best equipped to develop mixtures that meet them.
Know What You Are Pouring
What you are pouring affects the aggregate size, workability, exposure needs, and finishing method, so tell the supplier whether it is a slab, footing, wall, driveway, patio, sidewalk, or column.
NRMCA CIP 31 notes that one project may need different concrete mixtures for different parts of the structure. A footing, an interior floor, and an exterior driveway should not be treated as one order by default.
Measure the Placement Before Calling
Confirm length, width, thickness, footing depth, thickened edges, pads, and steps before you call, because these drive the quantity.
A full list of measurements belongs in a takeoff. See how to create a concrete material takeoff, and use the concrete slab calculator or footing calculator for each element.
Calculate Theoretical Concrete Volume
Theoretical volume is length times width times thickness, converted to cubic yards. With thickness in inches, divide by 324.
Variables: length and width in feet, thickness in inches. The 324 comes from 12 inches per foot times 27 cubic feet per cubic yard.
Example: a 12 × 12 ft patio slab, 4 in. thick: 12 × 12 × 4 ÷ 324 = 1.78 yd³.
Result: 1.78 yd³ theoretical, before any ordering allowance.
The cubic yard calculator does the same conversion if you prefer a tool.
Add the Ordering Allowance Separately
Add an ordering allowance on top of the theoretical volume to cover job contingencies. NRMCA CIP 31 recommends approximately 4% to 10% above the plan estimate for things like over-excavation, form spread, and spillage.
Pick the allowance based on your site, not a habit. A level, well-formed slab on firm ground may need less than a pour over uneven fill.
Keep this allowance separate from waste. Planning guidance for the full job is in how to estimate a concrete job.
Turn your concrete project plan into an estimate
Move from concrete quantities and project planning to an organized estimate using a downloadable Excel workbook for concrete contractors.
One-time purchase · Digital download · Microsoft Excel workbookWorked Example: 20 × 30 ft × 5-in. Slab
A 20 × 30 ft slab at 5 inches thick has a theoretical volume of 9.26 cubic yards. With an illustrative 6% allowance, the planned quantity is 9.82 cubic yards.
Step 1: theoretical volume = 20 × 30 × 5 ÷ 324 = 9.26 yd³.
Step 2: illustrative 6% allowance = 9.26 × 0.06 = 0.56 yd³.
Result: planned quantity = 9.26 + 0.56 = 9.82 yd³, or about 9.8 yd³ before the supplier’s increment is applied.
| Item | Example |
|---|---|
| Length | 20 ft |
| Width | 30 ft |
| Thickness | 5 in. |
| Theoretical quantity | 9.26 yd³ |
| Illustrative allowance | 6% |
| Allowance quantity | 0.56 yd³ |
| Planned order | 9.82 yd³ |
| Supplier order increment | Confirm |
| Final quantity ordered | Confirm with supplier |
The 6% figure is illustrative, not a universal recommendation. Across NRMCA’s 4% to 10% range, the same slab would be about 9.63 to 10.19 yd³.
Ask the supplier what order increment and truck loading arrangement they use. Do not assume the order should be rounded to exactly 10.0 yd³ without their confirmation.
Avoid Shortage and Excess on the Final Load
Reevaluate the quantity as the placement nears its end, so you avoid both a shortage and an oversized last load. NRMCA CIP 31 advises avoiding excessive concrete orders and small clean-up loads under 4 cubic yards.
Track what has been delivered and placed, and measure the remaining area while the crew is still working. Then you can call the plant with a real number for the last truck.
A delivered-placed-returned record also makes it easy to see how much of your allowance was actually used, which improves the next order.
Calculate the theoretical quantity first and keep the planned ordering allowance separate from actual leftover or wasted concrete.
What Concrete Strength Should You Order?
Use the strength and test age stated in the project documents. NRMCA CIP 31 notes that a specified strength of 3,500 to 5,000 psi is typical for most applications, but the designer sets it from loads and exposure.
If no specification exists, describe the application, exposure, and loading to the supplier or a qualified contractor instead of inventing a structural requirement.
For terminology, see the concrete PSI guide. Remember that strength tells only part of the story.
Tell the Supplier the Mix Design or Mixture Designation
A mixture designation is a name or code for each concrete type on the project. NRMCA CIP 31 says one should be established for each mixture so the right concrete goes in the right place.
That prevents an exterior mix going into an interior floor, a footing mix into a structural wall, or a load missing the specified fibers or admixture. Quote the designation each time you order.
Specify the Required Slump or Slump Flow
Slump measures the consistency of fresh concrete, and slump flow is the equivalent measure for self-consolidating concrete where specified. Order the slump required by the project, or agree on an appropriate one with the producer for your placement method.
NRMCA CIP 31 says most applications use about 3 to 5 inches, slip-form work uses a maximum of about 2 inches, and pumped, congested, or basement-wall placements may need 7 to 9 inches. Treat those as examples, not slab rules.
NRMCA also states the producer is responsible for the specified slump for 30 minutes after the requested time or the truck’s arrival, whichever is later. See the concrete slump test procedure for how slump is checked.
Specify the Coarse Aggregate Size
The nominal maximum aggregate size must be smaller than the narrowest dimension the concrete has to flow through, such as section thickness, rebar spacing, or formwork clearances. NRMCA CIP 31 notes 3/4 or 1 inch is common for most applications.
Do not simply order three-quarter-inch rock for every placement. A thin section or tight rebar may need a smaller size.
Specify Air Content or Exposure Requirement
Exposure to freezing in service calls for air-entrained concrete, and NRMCA CIP 31 says it is the default for exterior concrete in many regions. If you want non-air-entrained concrete, say so clearly.
Target air content depends on aggregate size and exposure, and NRMCA gives a typical range of 4 to 6 percent with a delivered tolerance of plus or minus 1.5 percent. Order to the specified exposure or air requirement rather than a fixed number.
Jobsite water addition can increase air content, which is one more reason to control it.
Confirm Fibers and Admixtures
Confirm any fibers or admixtures before the order is batched. NRMCA CIP 31 notes admixtures can modify setting, improve workability, and help with hot or cold weather, and synthetic fibers can reduce plastic shrinkage cracking potential.
Order only those required or approved for the job. The producer is not responsible for concrete modified at the jobsite with added admixtures, fibers, or water.
For weather planning, see pouring concrete in hot weather and cold weather concrete.
Direct Chute, Pump, Buggy or Wheelbarrow?
Tell the supplier whether the concrete will go in by direct chute, pump, buggy, or wheelbarrow, because it affects delivery rate, workability, and site logistics. Ask this before the mixture is confirmed.
Direct chute is quickest but needs truck access. Pump, buggy, or wheelbarrow placement slows the delivery rate and may call for a different slump.
What If the Concrete Will Be Pumped?
Yes, tell the producer before batching. NRMCA CIP 31 says the purchaser must inform the producer when placement procedures, such as pumping, could alter the fresh concrete so the mixture can be adjusted.
Book the pump separately and ask about its setup space and arrival time. The pump should be set before the first truck arrives.
How Far Can the Truck Get From the Pour?
Confirm how close the truck can get, including chute reach, route, soil bearing, turning radius, and slope. Do not assume a driver will cross a lawn or residential driveway.
If the truck cannot reach the pour, plan a pump, buggy, or conveyor, and tell the supplier before delivery day.
Check Access for a Loaded Mixer
A loaded mixer weighs about 80,000 lb according to NRMCA CIP 31, and it may not be able to maneuver on loose dirt and residential curbs or pathways. Check the site against this list before delivery.
| Check | Why it matters |
|---|---|
| Road width | Mixer access |
| Gate width | Vehicle clearance |
| Turning area | Maneuvering |
| Soft soil | Truck can sink |
| Curbs | Can be damaged |
| Septic tank | Heavy truck hazard |
| Buried utilities | Loading hazard |
| Overhead wires | Boom or truck hazard |
| Chute reach | Placement feasibility |
| Pump location | Setup space |
Also look for tree branches that block the chute path. Overhead lines are a serious hazard, so keep the truck and pump away from them.
Choose the Delivery Date and Requested Start Time
Order well in advance, and have the crew, forms, reinforcement, pump, testing equipment, tools, and curing materials ready before the truck arrives. NRMCA CIP 31 calls concrete a perishable product.
NRMCA adds that concrete normally sets within about two to eight hours after mixing, so delays cost quality. Notify the producer immediately of any schedule change or work stoppage.
Weather matters too. See how to protect fresh concrete from heavy rain if rain is possible.
Estimate Your Concrete Placement Rate
Placement rate is the concrete quantity divided by the time it takes your crew to place and finish it.
Example: 24 yd³ placed in 3 hours.
Result: 24 ÷ 3 = 8 yd³ per hour.
Use a realistic rate for your crew size, method, and finishing sequence. A faster delivery than the crew can place only creates a queue.
Calculate Truck Spacing
Truck interval is the truck load divided by the placement rate, times 60 minutes. NRMCA CIP 31 says delivery rate should be based on the placement method and the pour duration.
Example (illustrative): an 8 yd³ truck load and a placement rate of 8 yd³ per hour.
Calculation: 8 ÷ 8 × 60 = 60 minutes. With a 10 yd³ load at the same rate, the interval would be 75 minutes.
Interpretation: use the actual load size your supplier confirms.
Trucks that arrive too close together queue, which risks slump loss, standby fees, and rushed placement. Trucks that arrive too far apart leave the crew idle and can create unintended construction joints.
Truck spacing should be based on the amount your crew can actually place per hour, not on an arbitrary delivery interval.
Ask About Truck Capacity, Minimum Orders and Fees
Ask directly about the typical truck load, partial loads, minimum quantity, short-load charges, standby fees, cancellation policy, and weekend or after-hours charges. NRMCA CIP 31 gives truck-mixer capacity as roughly 8 to 12 cubic yards, but your supplier’s fleet may differ.
| Question | Why ask |
|---|---|
| Cost per yd³? | Base material cost |
| Minimum order? | Small projects |
| Short-load fee? | Partial trucks |
| Waiting or standby fee? | Slow placement |
| Fuel surcharge? | True delivered price |
| Admixture charge? | Mix extras |
| Fiber charge? | Specified reinforcement |
| Saturday or after-hours charge? | Scheduling |
| Cancellation policy? | Weather risk |
| Returned-concrete policy? | Over-order risk |
These are supplier-specific, so no universal dollar values are given here.
For price context, read the ready-mix concrete cost per yard guide and concrete delivery cost, or run numbers in the concrete pour cost calculator.
The Day-Before-Pour Checklist
The day before, confirm the order, weather, forms, elevations, reinforcement, vapor retarder if applicable, access, pump, crew, finishing tools, curing supplies, and washout location.
For larger projects, NRMCA CIP 32 recommends a pre-pour meeting to settle delivery schedules, lead times, contacts for delays or cancellations, truck staging, and washout locations.
Related how-to guides cover pouring a slab and pouring a driveway, and the curing guide covers what happens after.
What to Check When the First Truck Arrives
Before major discharge, check the company and job, mix designation, quantity, required admixtures and fibers, ticket times, water fields, and any obvious inconsistencies. NRMCA CIP 31 makes the purchaser responsible for verifying the mixture delivered and directing it to the right placement.
Our guide to reading a ready-mix delivery ticket explains each field in detail.
What If the Concrete Looks Too Stiff?
Do not automatically add water. Check the required slump, check the ticket, and involve the supplier or an authorized person first. NRMCA’s concrete materials FAQ says ASTM C94 permits jobsite water when slump is below the requirement and the mixture’s design water is not exceeded.
Any requested addition should be documented and signed on the delivery ticket, and the batch needs at least 30 more mixer revolutions afterward. NRMCA also warns that excess water can reduce strength and raise cracking risk.
NRMCA CIP 26 adds that water should not be added once the maximum slump or water content is reached, or after more than a small portion of the load has been discharged.
A water-reducing admixture can raise slump without the strength loss of extra water, but it should be coordinated with the supplier and specification, not improvised on site.
What If the Delivery Ticket Does Not Match the Order?
If the ticket does not match the order, stop and verify before unloading. Look for the wrong mix ID, wrong quantity, missing fibers, wrong air requirement, an unexpected admixture, or a questionable time limit.
| Ticket item | Verify against |
|---|---|
| Job or project | Order |
| Mix ID | Approved or ordered mix |
| Load quantity | Dispatch plan |
| Cumulative quantity | Placement tracking |
| Batch or start time | Applicable time limit |
| Slump requirement | Specification |
| Air requirement | Specification |
| Fibers | Order |
| Admixtures | Order |
| Water added | Ticket or authorization |
| Delivery destination | Correct placement |
The 90-minute question comes up often. Older editions of ASTM C94 cited a limit of 90 minutes or 300 revolutions that the purchaser could waive, and current ordering provisions let the purchaser specify a time limit, with the producer setting and communicating one otherwise.
So do not reject every truck automatically at 90 minutes. Check your specification and the time limit stated for your order and ticket.
What Records Should You Keep?
Keep the order confirmation, supplier quotation, delivery tickets, water and admixture adjustments, test reports, and placement notes. NRMCA CIP 31 says the purchaser should check and sign the delivery ticket and document special occurrences on it.
If strength tests are used for acceptance, NRMCA says samples are taken at the point of discharge, with test specimens cured and handled by certified personnel. Those records belong in the same file.
For job-level planning, see the concrete contractor bid checklist.
Final Ready-Mix Ordering Checklist
| Check | Complete? |
|---|---|
| Current drawings and specification reviewed | ☐ |
| Mix designation confirmed | ☐ |
| Volume calculated | ☐ |
| Ordering allowance selected | ☐ |
| Final quantity confirmed | ☐ |
| Strength requirement confirmed | ☐ |
| Aggregate size confirmed | ☐ |
| Slump or slump flow confirmed | ☐ |
| Air requirement confirmed | ☐ |
| Admixtures and fibers confirmed | ☐ |
| Placement method communicated | ☐ |
| Pump booked if required | ☐ |
| Truck load size confirmed | ☐ |
| Delivery rate established | ☐ |
| Jobsite access confirmed | ☐ |
| Fees and minimums checked | ☐ |
| Weather reviewed | ☐ |
| Crew ready | ☐ |
| Washout location ready | ☐ |
| Ticket-check responsibility assigned | ☐ |
Ready-Mix Concrete Ordering FAQs
What do I say when ordering ready-mix concrete?
Give your name and account, the exact address, what you are pouring, the required mix designation or specification, quantity, delivery date and start time, placement method, delivery rate, and any access limits. Mention pumping, air entrainment, fibers, and admixtures up front so the plant can batch the right mixture.
How many yards should I order?
Calculate the theoretical volume as length times width times thickness in inches, divided by 324, then add an ordering allowance. NRMCA suggests about 4% to 10% above the plan quantity for contingencies. Confirm the final figure and load arrangement with your supplier.
How much extra concrete should I order?
NRMCA recommends ordering approximately 4% to 10% more than the volume calculated from plan dimensions, to cover over-excavation, form spread, and spillage. Choose the allowance based on your measurements and site, and avoid ordering excessive concrete or small clean-up loads.
What PSI concrete do I need?
Use the strength and test age in your project documents. NRMCA notes that 3,500 to 5,000 psi is typical for most applications, but the requirement depends on loads, exposure, and code. With no specification, describe the application and exposure to your supplier and ask which standard mixture they recommend.
What slump should I order?
Use the slump in the specification, or agree on one with the producer for your placement method. NRMCA says most applications use about 3 to 5 inches, while pumped or congested work may need 7 to 9 inches. Do not treat those examples as universal slab rules.
Do I need air-entrained concrete?
Concrete exposed to freezing in service needs air-entrained concrete, and NRMCA says it is the default for exterior concrete in many regions. Target air depends on aggregate size and exposure, typically 4 to 6 percent. State clearly if you want non-air-entrained concrete, and order to the specified requirement.
What aggregate size should I specify?
Specify the nominal maximum size your specification calls for. It must be smaller than the narrowest dimension the concrete must flow through, such as section thickness or rebar spacing. NRMCA notes 3/4 or 1 inch is common, but do not assume it for every placement.
Do I tell the plant I am pumping?
Yes. NRMCA says the purchaser must tell the producer when placement, such as pumping, may alter the fresh concrete, so the mixture can be adjusted. Tell the dispatcher before batching, and book the pump separately so it is set up before the first truck arrives.
How many yards fit in a concrete truck?
NRMCA gives about 8 to 12 cubic yards as the general capacity of a truck mixer. The actual load depends on the supplier’s fleet, legal weight limits, and road restrictions, so ask what each truck will carry before you plan your delivery spacing.
How far apart should concrete trucks arrive?
Base spacing on how much your crew can place per hour. Divide the truck load by the placement rate and multiply by 60 for minutes. For example, an 8 yd³ load at 8 yd³ per hour means a truck about every 60 minutes. Confirm the real load size with your supplier.
Can I add water to ready-mix concrete?
Sometimes. ASTM C94 permits jobsite water if slump is below the requirement and the mixture’s design water is not exceeded, and the addition should be documented on the delivery ticket. It is not a casual finishing aid, because excess water can reduce strength and increase cracking. Involve the supplier.
Is concrete automatically rejected after 90 minutes?
No. Older ASTM C94 editions cited 90 minutes or 300 revolutions, and the purchaser could waive it. Current ordering provisions let the purchaser specify a limit, and the producer otherwise sets and communicates one. Check your specification and the time limit stated for your order or ticket.
What if the wrong mix arrives?
Stop and verify before discharge. Compare the mix designation, quantity, air, fibers, and admixtures with your order, and contact the supplier. NRMCA says the purchaser is responsible for verifying the delivered mixture, and the ticket should be signed with any special occurrences documented.
What should I check on the delivery ticket?
Check the job and address, mix designation, load and cumulative quantity, batch and start times, slump and air requirements, fibers and admixtures, and any water added. Compare each item with your order before discharge. Our delivery ticket guide walks through each field.
Ordering ready-mix concrete well comes down to a short sequence: confirm the specification, calculate the quantity and allowance, state the mixture and placement method, set the delivery rate, check access, and verify the ticket.
Use the checklist above on your next call, and read the delivery ticket guide before the first truck arrives.
Get your theoretical cubic yards first, then add your ordering allowance and confirm the final order with the supplier.
Use the Concrete Slab Calculator



