30 ft foundation wall, 4 ft high, 8 inches thick
Wall face volume: 30 × 4 × 0.667 = 80.04 ft³
Footing: 16 in × 8 in × 30 ft = 26.7 ft³
Total = 106.74 ft³ ÷ 27 = 3.95 yd³
With 10% waste = 4.35 yd³
At $155/yd³ = $674.25 concrete
Foundation walls this size usually need engineered rebar drawings rather than a default grid, so treat this as material planning only.