School Playground Example
Area: 40 ft × 30 ft = 1,200 sq ft
Installed depth: 12 in
Base volume: 1,200 cu ft
Cubic yards: 1,200 ÷ 27 = 44.44 cu yd
Estimated order before overage: 44.44 cubic yards
Add 10% overage and the order becomes about 48.89 cubic yards. If that same surface settles by 25%, the maintained depth is about 9 inches, which matches a common loose-fill planning target.